Pre-pilot gate (spec sections 10, 16, 17), not a numbered build step:
the assessment-quality rubric must exist before the pilot's first
deliverable is scored. A pilot scored without it leaves G-2 asserted,
not verified.
Done when:
This work also sets any post-pilot sampling rule for verification,
replacing the pilot's check-every-finding floor (section 10).
Pre-pilot gate (spec sections 10, 16, 17), not a numbered build step:
the assessment-quality rubric must exist before the pilot's first
deliverable is scored. A pilot scored without it leaves G-2 asserted,
not verified.
Done when:
distinct from
criteria.md, which scores a project's docs.baseline assessments to set a reference band (sections 2, 10).
This work also sets any post-pilot sampling rule for verification,
replacing the pilot's check-every-finding floor (section 10).